Project Details

Construction and pre-commissioning of South Pars 20, 21 onshore Facilities

STEAM Projects

Project code:  041
Contract Award Date: 2014
Project Name:  Installation and pre-commissioning of the (E) section of the land section of the Phase 20 and 21 Phase Projects of South Pars gas field development
Client:  OIEC Petroleum Engineering and Building Company
Description:
Development of South Pars phases 20 and 21 was awarded to OIEC both onshore and offshore to produce 2 bscfd reservoir fluids by drilling 24 wells, installing 2 unmanned wellhead platforms and transferring fluids to the onshore refinery by two 32 “subsea pipelines. The onshore facilities were developed on the basis of supplying treated lean gas to the domestic network and ethane gas to nearby petrochemical complexes, LPG (propane and butane) for export and condensate both for export and domestic use. South Pars phases 20 & 21 was a significant mega gas project in which the OIEC Group gained unparalleled experience and capabilities through designing. construction and management of such a project onshore and offshore, upstream and downstream
Duration:   26 Month
Location: South Pars Gas Fields Phases 20 and 21